Electric Gates by the Numbers: Install Times, Bollards and Retrofits

Installation timelines, retrofit prices and bollard spans: the figures that explain most electric gate quotes.

Row of stainless steel bollards at a building entrance

Electric gate quotes can look very different from one company to the next, but most of the difference comes down to a handful of numbers: how long the job takes, how wide the entrance is, what is already there and how much automation you want. Charting those figures makes quotes far easier to compare.


Time on site


  • Standard installation: around 1 day, where the pillars are sound and surface-mounted motors are used
  • New posts needed: around 1 to 2 days, as concrete needs 24 to 48 hours to cure before the gates are hung
  • Complex installation: around 2 to 3 days for in-ground motors, long cable trenches or smart home integration


A typical electric gate installation runs through seven stages: posts and groundworks, hanging the gates, fitting the motors, electrical connection, safety devices, access control, then testing and handover.


Retrofit or replace?


If the gates you already have are sound, adding motors is usually the cheapest way to an automated entrance. Typical starting prices:


  • Swing gate retrofit, entry level: from around £1,800
  • Sliding gate retrofit, entry level: from around £2,400
  • Swing gate retrofit, higher specification: around £2,600
  • New gates with automation: from around £3,800


The catch is condition. A gate that drags, binds or sits on leaning posts needs fixing first, because a motor will expose a mechanical problem rather than cure it. A specialist in automating an existing gate will check the weight, hinges, pillars and alignment before recommending a motor.


Bollard spans


Where a gate will not fit or will not get consent, rising bollards are charted by the width they cover:


  • 1 bollard: narrow entrances and single-vehicle access
  • 2 bollards: standard residential driveways
  • 3 bollards: wider drives and shared access roads
  • 4 bollards: commercial entrances, up to around 6 metres in one system


Wider openings can use two systems run together. Because rising bollards lower flush with the ground, they suit listed and conservation-area properties where a gate would change the look of the frontage.


Safety is not optional


Every automated gate in the UK should meet BS EN 12453, with photocells, safety edges and force limitation tested before handover, and be serviced once a year. Any quote that leaves these out is not comparing like with like.


A few figures make it much easier to see where a quote is heading. For more on fabricators and the numbers behind their work, see our manufacturing category.

More Posts, Facts, Tools & Charts

Close-up of a timber garden fence
October 30, 2026
Fencing per metre, gate prices by type and decking lifespans: the figures behind a Cardiff garden quote, with a simple way to turn them into a budget.
Mini digger excavating ground for a new driveway
October 30, 2026
Digger sizes, sub-base depths, resin lifespans and the order of work: the groundwork figures behind a new driveway or patio quote, explained simply.
Older woman holding her hands to her ears
October 30, 2026
Ear wax removal in figures: olive oil preparation days, minutes per ear, prices per ear, journey times from West Bridgford and Hucknall, and aftercare.
Garden seating area beside a timber fence and planted borders
October 30, 2026
How long patios, garden walls and fences take, the best order to build them in and the height limits to check, charted as one garden makeover timeline.
Modern house with a large grey paved driveway and planted borders
October 30, 2026
Guide prices per square metre for tarmac, block paving and resin driveways, plus what sits under the surface, lifespans and time on site, charted and compared.
Curved garden steps and block paving edged with a low stone retaining wall
October 30, 2026
The numbers behind a garden project: patio falls, drainage tests, fence and decking heights, and the figures worth charting to compare landscaping quotes.
Brick house with gated driveway entrance and front garden
October 30, 2026
Driveway gate widths, side clearances and typical prices explained, plus four figures worth charting when you compare quotes for made-to-measure gates.
Van loaded with furniture and boxes outside a house during a clearance
October 30, 2026
Typical house clearance costs by property size, how long a clearance takes, skip versus clearance team and the figures worth charting when comparing quotes.
Designer reviewing a 3D CAD model of a part on a laptop
October 30, 2026
How long a prototyping project takes, from 3D design to printing and testing, typical overall timelines and four figures worth charting for every project.
Calculator and pen on printed financial figures
October 29, 2026
Start-up costs for cleaning, dog grooming, mobile mechanic and aesthetics businesses, pricing, break-even and the five figures to chart in year one.
More Posts