Tree Work by the Numbers: Protection Rules, Timing and What Drives the Price

The protection rules, seasons, cutting limits and cost factors behind most tree surgery quotes.

Worker dragging branches to a wood chipper on a driveway

Tree work is easier to plan and to price when you know the figures behind it. These are the numbers that decide when work can happen, how much can be cut and what makes one quote higher than another, along with the simple charts that make them easy to follow.


Protection rules: 75mm, 1.5 metres and six weeks


  • Tree Preservation Orders: written consent from the council is needed before pruning or felling a protected tree, even in a private garden
  • Conservation areas: six weeks' written notice is normally needed before work on any tree with a trunk of 75mm or more in diameter, measured 1.5 metres above the ground
  • Dead trees: one of the limited exceptions, but notice is usually still required, normally at least five working days before the work


Timing: the nesting season and the dormant season


Active birds' nests are protected under the Wildlife and Countryside Act 1981, and the main nesting season runs roughly from February to August. Work can still go ahead in those months, but trees and hedges need checking first. For many deciduous trees, late autumn and winter is the practical time for tree pruning in Colchester and elsewhere, as the leaves are off and the structure is easy to see. Cherries and plums are the main exception, as they are pruned in summer to reduce the risk of silver leaf disease.


How much can be cut?


A good crown reduction takes the whole canopy back to healthy growth points rather than topping the tree, and usually removes no more than around a quarter to a third of the leaf area at once. Taking more can leave a tree stressed and prone to decay.


Pollarding works differently. The tree is cut back hard to the same knuckles on a repeating cycle, and garden limes and willows are commonly re-cut every one to three years. A regular pollarding cycle keeps a suitable tree at a manageable size for decades.


What drives the price


  • Size and height: a tree that has to be climbed and dismantled in sections takes far longer than one felled in one piece
  • Access: a rear garden with no side access means every branch and log has to be carried through
  • What is nearby: roofs, greenhouses, fences and cables mean branches are roped and lowered rather than dropped
  • Waste: whether branches are chipped and removed, or chips and logs are left for you
  • Stumps: stump grinding is usually an add-on, priced mainly on the stump's diameter and access


For tree removal and stump grinding, a few photos showing the whole tree, anything close to it and the route from the road are usually enough for a provisional figure.


Three charts worth keeping


  • Timeline: the months when work is planned against the nesting season and any six-week notice period
  • Stacked bar: how each quote splits between climbing, waste removal and stump grinding
  • Line chart: crown height after each reduction or pollard cut, to show the tree staying in check over the years


With the key figures written down, quotes become much easier to compare like for like. For more on charting garden and landscaping work, see our landscapers category.

More Posts, Facts, Tools & Charts

Black spear-top railings against a white wall
October 30, 2026
Railing heights and bar spacing, Part K handrail heights, gate widths and typical prices: the figures behind most metalwork quotes, plus three charts to keep.
Empty open-plan office after a clearance
October 30, 2026
Office clearance in numbers: estimating volumes, handling WEEE electricals, phased or one-visit clearances, the paperwork to keep and three charts worth using.
Tile adhesive combed out across a levelled floor
October 30, 2026
Screed depths, drying times and which floors suit underfloor heating: the figures to plan around, and three simple charts that make them easy to track.
Close-up of a timber garden fence
October 30, 2026
Fencing per metre, gate prices by type and decking lifespans: the figures behind a Cardiff garden quote, with a simple way to turn them into a budget.
Ornate black metal gates at the entrance to a property
October 30, 2026
Install times, retrofit prices, bollard spans and safety standards: the electric gate figures that explain why quotes differ, explained simply.
Mini digger excavating ground for a new driveway
October 30, 2026
Digger sizes, sub-base depths, resin lifespans and the order of work: the groundwork figures behind a new driveway or patio quote, explained simply.
Older woman holding her hands to her ears
October 30, 2026
Ear wax removal in figures: olive oil preparation days, minutes per ear, prices per ear, journey times from West Bridgford and Hucknall, and aftercare.
Garden seating area beside a timber fence and planted borders
October 30, 2026
How long patios, garden walls and fences take, the best order to build them in and the height limits to check, charted as one garden makeover timeline.
Modern house with a large grey paved driveway and planted borders
October 30, 2026
Guide prices per square metre for tarmac, block paving and resin driveways, plus what sits under the surface, lifespans and time on site, charted and compared.
Curved garden steps and block paving edged with a low stone retaining wall
October 30, 2026
The numbers behind a garden project: patio falls, drainage tests, fence and decking heights, and the figures worth charting to compare landscaping quotes.
More Posts